Showing posts with label reverse cycle. Show all posts
Showing posts with label reverse cycle. Show all posts

Sunday, 10 October 2010

New Pics :)

We have been talking to the builder again this week.
The good news: The tiler *should* be starting this week :)
The excavator *should* be coming Tuesday to dig up the pipe causing us all the drama


The not so good news: We won't be moving in until AT LEAST mid November :( The builder estimates we will move in 5 weeks after the tiler finishes (the first time he has even given us an estimate of a move in date) Nothing much can be done until the tilers are finished so we are hoping that we will get lots of tiles done this week!



The site has been levelled. This is where the garden goes :)











The line is where we are going to pave. The pavers will go past the sliding door to the BBQ gas point, and around the corner up to where the air con unit is. 2m wide near door, 3m wide along side of the house









Looking towards the street. This side will all be garden (except for paved area)











We have shed roller doors!!











Tile boxes! :D Now we just need a tiler to put them all down!














333ml floor tiles. These are the same throughout the whole house.

 The feature tile for the bathroom will be three rows of these squares wide and will run horizontally above the shower and bath. In the kitchen the same tiles will be used in 9small squares to make one square, laid as a diamond.
Wall tile, feature and floor tiles are all the same throughout. Wall is garage lining painted in 1/4 hog bristle
















The shed kit has arrived. They just dumped it out the front :( so it took us about 3hrs to break it up and carry it into the garage piece by piece :P


The front door is also here :) This is the top of it, it will be stained by the painters when they come back after the tilers come.

The paint is looking awesome! This is the niche all painted and ready to be go :)


 Not a good pic but you can see the finished paint and aircon installed :)
 The top cupboards look darker now that the paint has been done (peruvian clay - laminate)
The daiken air conditioner :D :D













 Bath ready for tiles












Shower base is done


















 The backyard and paddock crazy with weeds
 Looking from the front door
The front of house now that the site has been levelled. We even have a strip of turf left over from the house across the road! I don't know if there is much point though, it'll just die as we won't be there to water it :(

Thursday, 29 July 2010

Bricks, gyprock and cornices!

I survived our 3 week Cape York trip and had a great time (away from the winter - 32*C up the top! mmmm), so now it's time to update you on all the house progress :)

The bricks were finished around the 5th of July. As we had a lot of wet weather there was little progress until the following week when we had the gyprock installed on 14th-16th. Since then we have had more rain with minor flooding in local creeks so progress has slowed again. The cornices are all installed as well as the lining of the garage and framing (?) around the front door way. We are yet to get skirting boards installed.

The water points/pipes are all in place in the bathroom (with a possible wrong fitting for one - we are having a mixer in the shower but there are two pipes sticking way out of the wall, not sure if this is just hot and cold or if it needs to be changed to one pipe. We will need to look into it) The reverse cycle aircon wiring is also installed in the wall in the living area.

Current things to discuss with builder/SS are: mixer in bathroom, relocation of tank as it looks like they are planning to put it where the shed is going to be, finding out if the verandah will be cemented - i hope so but not sure! and whether we are having flyscreens (windows currently do not have them, we think they will put them in before handover as we are pretty sure they are meant to be included)

Photos care of dear husband who kept me updated while i was away :)



above: pink batts in our bedroom to reduce noise & insulate as hubby is a shift worker. Below: kitchen/living wall with wiring. Thick wiring with orange cord is for reverse cycle aircon unit
above: plaster people hard at work. Looking down hallway from front door. Below: My beautiful corner niche which is visible from lounge room and front door/hallway (see above pic) soooo glad we added this :)
above: kitchen and sunlight :) on left is pantry and linen then hallway to front door. Notice aircon cord poking out! Below: same room from opposite direction, this will all be open tiled area. The doorway to  the right leads to bed1, bathroom, toilet and bed 2
Below: Shower pipes that may need to be changed.
above: gas tap for bbq and external powerpoint for future outdoor area. Below: water pipe and power for pump (we are on all tank water except kitchen tap and two outdoor taps). I think other cords coming from ground may be the power for the shed.
North side of the house in late afternoon. The sun makes the bricks glow a lovely golden colour :)