The first drama of the build...

Today i went to see our SS to check on a few things. It turns out the tap fittings are wrong in the shower, and for the vanity :( The only way to have mixers is to pull off the gyprock and re-do the plumbing. The builder went off the original plans as we hadn't told him we were having mixers. We had assumed that the people we got the taps from would have told him or he would have seen it on the quote and when he ordered them. That's ok, it was a mixup and probably mostly our fault.

I told them not to worry, we'll just have normal taps. When i told DH he had other ideas and insisted we get the mixers, so back to the builder i went to say we did want it fixed. Problem is 1. We have to foot the $500 bill to change it and 2. They have to have the mixer tap to install into the wall when they do the plumbing. So off i went to the shop to find out where our order was at... and the lady couldn't find our order!

So now we need to wait for them to find out where our order is (arrived, on order or lost in the abyss) so that we can take the mixers so that the plumber and plasterer can be booked to change the plumbing and re-do the wall again!

It's going to be one expensive mixer by the time we are done!

Thursday 29 July 2010

Bricks, gyprock and cornices!

I survived our 3 week Cape York trip and had a great time (away from the winter - 32*C up the top! mmmm), so now it's time to update you on all the house progress :)

The bricks were finished around the 5th of July. As we had a lot of wet weather there was little progress until the following week when we had the gyprock installed on 14th-16th. Since then we have had more rain with minor flooding in local creeks so progress has slowed again. The cornices are all installed as well as the lining of the garage and framing (?) around the front door way. We are yet to get skirting boards installed.

The water points/pipes are all in place in the bathroom (with a possible wrong fitting for one - we are having a mixer in the shower but there are two pipes sticking way out of the wall, not sure if this is just hot and cold or if it needs to be changed to one pipe. We will need to look into it) The reverse cycle aircon wiring is also installed in the wall in the living area.

Current things to discuss with builder/SS are: mixer in bathroom, relocation of tank as it looks like they are planning to put it where the shed is going to be, finding out if the verandah will be cemented - i hope so but not sure! and whether we are having flyscreens (windows currently do not have them, we think they will put them in before handover as we are pretty sure they are meant to be included)

Photos care of dear husband who kept me updated while i was away :)



above: pink batts in our bedroom to reduce noise & insulate as hubby is a shift worker. Below: kitchen/living wall with wiring. Thick wiring with orange cord is for reverse cycle aircon unit
above: plaster people hard at work. Looking down hallway from front door. Below: My beautiful corner niche which is visible from lounge room and front door/hallway (see above pic) soooo glad we added this :)
above: kitchen and sunlight :) on left is pantry and linen then hallway to front door. Notice aircon cord poking out! Below: same room from opposite direction, this will all be open tiled area. The doorway to  the right leads to bed1, bathroom, toilet and bed 2
Below: Shower pipes that may need to be changed.
above: gas tap for bbq and external powerpoint for future outdoor area. Below: water pipe and power for pump (we are on all tank water except kitchen tap and two outdoor taps). I think other cords coming from ground may be the power for the shed.
North side of the house in late afternoon. The sun makes the bricks glow a lovely golden colour :)

Saturday 3 July 2010

Bricks :)

The brick layers started on Thursdy as planned. I went around to the house thurs afternoon to find one row of bricks right around the base of the house. On Friday I went back at around 11am and this is what i found: