Today we found out that we will get our turf this week, we are not sure if they will need to re-scrape the site first. They better not wreck our watering system after the massive effort it took DH to put it in. The cleaner has been booked for this week and the council have scheduled their inspection for either friday or next week (can't remember exact day, i was too excited when he told us!!) We also have a shower screen and mirror.
The list of things still to be done:
'Whirly bird' and two eave vents to roof
Tv antenna
Turf
Clothes line
Mail box
Finish shelving in main bedroom
Clean whole house and SCRUB the toilet til it's looking brand new again!!!
Paint - touch up paint /clean walls where needed
Other possibles (undecided how much it will matter, we would rather have the keys if it comes down to it!)
* Turn around blinds above sink (so they hang at opposite end to sink)
*Possible re-paint of paint around front door
Our AWESOME neiche with downlight. Love love love!!
Checking out the dishwasher! :)
The oven is ready for some Christmas cooking! :D :D I can't wait! We have a shower screen :) I'm a little disappointed it is a white frame. The builder had previously said it would be chrome so i might ask about that
Hopefully all the news from here on in is good news! Bring on the turf...and KEYS!!
Showing posts with label paint. Show all posts
Showing posts with label paint. Show all posts
Tuesday, 23 November 2010
Thursday, 4 November 2010
digging
On the weekend we did some digging:
We were digging trenches to put in pipes and sprinklers for our watering system.
We dug out all the trenches with the dingo, but were a bit afraid to dig too deep as we weren't sure where all the pipes and underground phone/power was :s
So then we had to shovel out all the dirt and dig a bit deeper in places. We then linked up all the sprinklers but it was getting late so we decided to come back on the monday (which we both had off) to finish.
That night it RAINED and RAINED some more :S :( :( We haven't been back to do anymore as we've both been busy.
Light covers are included (for everything that isn't a downlight) We didn't realise we would get these so it's a bonus!! :D :D :D
The best pic i could get of the oven taken through the window on an angle :S
Front door with varnish. Love it, not so much the green :S Told the painter to do whatever he thought would look good!?!. At worst we have the cream paint so we can do it ourselves as if we have to. The rest of the paint looks good.
These were another bonus! :) One set on the side and one set out the back. Love them!
And finally a pic of the door handles. Still waiting on the carpet, hopefully it might come tomorrow. We are so close now, i hope it doesn't take too long. I guess we should start packing huh? Lol
We were digging trenches to put in pipes and sprinklers for our watering system.
We dug out all the trenches with the dingo, but were a bit afraid to dig too deep as we weren't sure where all the pipes and underground phone/power was :s
So then we had to shovel out all the dirt and dig a bit deeper in places. We then linked up all the sprinklers but it was getting late so we decided to come back on the monday (which we both had off) to finish.
That night it RAINED and RAINED some more :S :( :( We haven't been back to do anymore as we've both been busy.
Light covers are included (for everything that isn't a downlight) We didn't realise we would get these so it's a bonus!! :D :D :D
The best pic i could get of the oven taken through the window on an angle :S
Front door with varnish. Love it, not so much the green :S Told the painter to do whatever he thought would look good!?!. At worst we have the cream paint so we can do it ourselves as if we have to. The rest of the paint looks good.
These were another bonus! :) One set on the side and one set out the back. Love them!
And finally a pic of the door handles. Still waiting on the carpet, hopefully it might come tomorrow. We are so close now, i hope it doesn't take too long. I guess we should start packing huh? Lol
Friday, 29 October 2010
more toys! :D
Here's the latest:
Hand towel holder ( it looks big! :S) And that isn't my drink...
Near invisible soap holder and glass shelf! :) Hopefully it will match the shower screen :)
They have painted the shelf supports (the ones they forgot to do with the rest)
We have a toilet!
Not so happy to see that it's been used - or should i say ABUSED!! :( :( Bleughh. HOW RUDE. They better be cleaning it til it looks brand new again.
Oh, and you can see what the door handles look like :)
Gas cook top minus the black trivet (?) things that go on top. I realised today that they hadn't put the oven in yet. The electricians were there today doing all the power points and putting the oven in :)
Sink looking good. Not sure why they got the blinds to hang at that end of window :S Might have to change that...
Dishwasher! :D :D
Painters were there painting on the skirting boards Tilers have finished laying the extra tiles (the ones that were missing after they tiled the extra room by mistake)
Not sure about green verandah posts... and they painted green around the door - i think that should be cream as it looks a little strange...
They were staining / lacquering the front door (or whatever it's called :P) Happy to see action! :D
We (meaning I) have drawn up a plan for the garden - and a plan for the watering system with pop up sprinklers and water weeping hoses :D We (Meaning DH) plan to dig the trenches and put in the pipes this weekend! YAY!
Hand towel holder ( it looks big! :S) And that isn't my drink...
Near invisible soap holder and glass shelf! :) Hopefully it will match the shower screen :)
They have painted the shelf supports (the ones they forgot to do with the rest)
We have a toilet!
Not so happy to see that it's been used - or should i say ABUSED!! :( :( Bleughh. HOW RUDE. They better be cleaning it til it looks brand new again.
Oh, and you can see what the door handles look like :)
Gas cook top minus the black trivet (?) things that go on top. I realised today that they hadn't put the oven in yet. The electricians were there today doing all the power points and putting the oven in :)
Sink looking good. Not sure why they got the blinds to hang at that end of window :S Might have to change that...
Dishwasher! :D :D
Painters were there painting on the skirting boards Tilers have finished laying the extra tiles (the ones that were missing after they tiled the extra room by mistake)
Not sure about green verandah posts... and they painted green around the door - i think that should be cream as it looks a little strange...
They were staining / lacquering the front door (or whatever it's called :P) Happy to see action! :D
We (meaning I) have drawn up a plan for the garden - and a plan for the watering system with pop up sprinklers and water weeping hoses :D We (Meaning DH) plan to dig the trenches and put in the pipes this weekend! YAY!
Wednesday, 27 October 2010
Lastest additions
Here are some new things (I can't see in the house because the blinds are all CLOSED - how dare they, lol!)
New front door and door handle :) Door needs staining - this will be done when the painters come back to paint the skirting boards (not in yet), verandah posts and touch up paint.
We have a pump (a teeny one but still it is a pump) This is for the tank water as only some of our inside taps are fed by town water (Part of the BASIX/council water saving conditions). We still need to work out exactly which taps are tank water - each of our neighbours has a different idea! :S
And this is the tank - now fully installed. It will be beside the wall of the yet-to-be-built shed. Shed will be built on the right of the tank. One the left and behind the tank and shed will be my veggie gardens :)
Another view of the tank and backyard. The shed will be in the foreground, the remaining dirt will be turf, gardens, veggie patch and pavers :D
Speaking of turf - it will be laid in the next week or so. I went to the 'Bunny Warehouse' today to find out about lawn and yard watering systems. The dream is to have one that works itself with pop up sprinklers, burried pipes and timers. Hmmm i think the budget may have other ideas :(
Welcome to our home! :D I'm just imagining a Christmas wreath hanging there in a few weeks time. YAY, i can't wait :)
Don't let this boring box fool you - the instantaneous gas hot water system is one of the best toys in the house! It's going to be soooo good at Christmas with lots of people in the house and not having to worry about the hot water running out. Oh, and we're not paying for hot water that we haven't used! :P
The next time you see it, we will probably have turf! :)
New front door and door handle :) Door needs staining - this will be done when the painters come back to paint the skirting boards (not in yet), verandah posts and touch up paint.
We have a pump (a teeny one but still it is a pump) This is for the tank water as only some of our inside taps are fed by town water (Part of the BASIX/council water saving conditions). We still need to work out exactly which taps are tank water - each of our neighbours has a different idea! :S
And this is the tank - now fully installed. It will be beside the wall of the yet-to-be-built shed. Shed will be built on the right of the tank. One the left and behind the tank and shed will be my veggie gardens :)
Another view of the tank and backyard. The shed will be in the foreground, the remaining dirt will be turf, gardens, veggie patch and pavers :D
Speaking of turf - it will be laid in the next week or so. I went to the 'Bunny Warehouse' today to find out about lawn and yard watering systems. The dream is to have one that works itself with pop up sprinklers, burried pipes and timers. Hmmm i think the budget may have other ideas :(
Welcome to our home! :D I'm just imagining a Christmas wreath hanging there in a few weeks time. YAY, i can't wait :)
Don't let this boring box fool you - the instantaneous gas hot water system is one of the best toys in the house! It's going to be soooo good at Christmas with lots of people in the house and not having to worry about the hot water running out. Oh, and we're not paying for hot water that we haven't used! :P
The next time you see it, we will probably have turf! :)
Friday, 22 October 2010
Tile drama sorted :)
We ended up going with the tiles. The builder actually said he thought it looked better as tiles once he saw it this morning. It seems the tiler thought it was meant to be tiled and didn't check the plan.
This means we get a free room of tiles, feature tiles laid for free and we don't have to pay extra for laying diagonal tiles! Wooohoooo. Glad they stuffed up now lol. They have all been very generous and gone out of their way to make up for it. One happy customer here :D :D :D
When we were there meeting the builder it seemed like it was all systems go - we had the guy just finishing up installing the blinds, the plumber doing the vanity and taps, someone else installing the kitchen appliances and the carpet people came to measure the rooms!
Below: Guy taking the dishwasher in the front door :D
It is looking really nice now :) We have kitchen appliances all in, blinds finished, vanity and bathroom taps all done :)
Still waiting on: Skirting boards to be installed, tiles to be finished, paint to be touched up and skirting boards and posts out the front painted, carpet installed, power points, light fittings and switches, gas HWS installed, pump and tank connected (tank now in right place), grass going in next week, clothesline, mail box and then the KEYS :) Not long to go now, approx 3 weeks plus the time for council to approve and let us in.
New toys!!!
I didn't get any kitchen pics as the guy was there the whole time installing everything, i thought i'd be a bit strange to ask for him to move or have him in the pic :S Photos of kitchen next time.
Labels:
bathroom,
blinds,
carpet,
feature tiles,
garden,
mixer taps,
paint,
plumbing,
powerpoints,
taps,
tiles
Sunday, 10 October 2010
New Pics :)
We have been talking to the builder again this week.
The good news: The tiler *should* be starting this week :)
The excavator *should* be coming Tuesday to dig up the pipe causing us all the drama
The not so good news: We won't be moving in until AT LEAST mid November :( The builder estimates we will move in 5 weeks after the tiler finishes (the first time he has even given us an estimate of a move in date) Nothing much can be done until the tilers are finished so we are hoping that we will get lots of tiles done this week!
The site has been levelled. This is where the garden goes :)
The line is where we are going to pave. The pavers will go past the sliding door to the BBQ gas point, and around the corner up to where the air con unit is. 2m wide near door, 3m wide along side of the house
Looking towards the street. This side will all be garden (except for paved area)
We have shed roller doors!!
Tile boxes! :D Now we just need a tiler to put them all down!
333ml floor tiles. These are the same throughout the whole house.
The feature tile for the bathroom will be three rows of these squares wide and will run horizontally above the shower and bath. In the kitchen the same tiles will be used in 9small squares to make one square, laid as a diamond.
Wall tile, feature and floor tiles are all the same throughout. Wall is garage lining painted in 1/4 hog bristle
The shed kit has arrived. They just dumped it out the front :( so it took us about 3hrs to break it up and carry it into the garage piece by piece :P
Not a good pic but you can see the finished paint and aircon installed :)
The top cupboards look darker now that the paint has been done (peruvian clay - laminate)
Bath ready for tiles
Shower base is done
The backyard and paddock crazy with weeds
Looking from the front door
The good news: The tiler *should* be starting this week :)
The excavator *should* be coming Tuesday to dig up the pipe causing us all the drama
The not so good news: We won't be moving in until AT LEAST mid November :( The builder estimates we will move in 5 weeks after the tiler finishes (the first time he has even given us an estimate of a move in date) Nothing much can be done until the tilers are finished so we are hoping that we will get lots of tiles done this week!
The site has been levelled. This is where the garden goes :)
The line is where we are going to pave. The pavers will go past the sliding door to the BBQ gas point, and around the corner up to where the air con unit is. 2m wide near door, 3m wide along side of the house

Looking towards the street. This side will all be garden (except for paved area)
We have shed roller doors!!
Tile boxes! :D Now we just need a tiler to put them all down!
333ml floor tiles. These are the same throughout the whole house.
The feature tile for the bathroom will be three rows of these squares wide and will run horizontally above the shower and bath. In the kitchen the same tiles will be used in 9small squares to make one square, laid as a diamond.
Wall tile, feature and floor tiles are all the same throughout. Wall is garage lining painted in 1/4 hog bristle
The shed kit has arrived. They just dumped it out the front :( so it took us about 3hrs to break it up and carry it into the garage piece by piece :P
The front door is also here :) This is the top of it, it will be stained by the painters when they come back after the tilers come.

The paint is looking awesome! This is the niche all painted and ready to be go :)
Not a good pic but you can see the finished paint and aircon installed :)
The top cupboards look darker now that the paint has been done (peruvian clay - laminate)
The daiken air conditioner :D :D
Shower base is done
Looking from the front door
The front of house now that the site has been levelled. We even have a strip of turf left over from the house across the road! I don't know if there is much point though, it'll just die as we won't be there to water it :(
Subscribe to:
Posts (Atom)